Scheduling independent tasks to reduce mean finishing time
Full Text:
PDF
Buy this Article
Authors:
J. Bruno
Pennsylvania State Univ., University Park
E. G. Coffman, Jr.
Pennsylvania State Univ., University Park
R. Sethi
Pennsylvania State Univ., University Park
Published in:
· Magazine
Communications of the ACM
CACM Homepage
archive
Volume 17 Issue 7, July 1974
Pages 382-387
ACM
New York, NY
, USA
table of contents
doi>
10.1145/361011.361064
1974 Article
Bibliometrics
· Downloads (6 Weeks): 15
· Downloads (12 Months): 101
· Downloads (cumulative): 1,419
· Citation Count: 76
Tools and Resources
Buy this Article
Request Permissions
TOC Service:
Email
RSS
Save to Binder
Export Formats:
BibTeX
EndNote
ACM Ref
Share:
|
Tags:
algorithms
deterministic scheduling models
minimizing mean finishing time
minimizing mean flow time
optimal scheduling algorithms
scheduling
sequencing algorithms
sequencing and scheduling
Feedback
|
Switch to
single page view
(no tabs)
**Javascript is not enabled and is required for the "tabbed view" or switch to the
single page view
**
Powered by
The ACM Guide to Computing Literature
All Tags
Export Formats
Save to Binder