SIGN IN
SIGN UP
Handling contingencies in planned office activities
Full Text:
PDF
Buy this Article
Author:
Agustin Araya
FMC Corp., Santa Clara, CA
Published in:
· Proceeding
IEA/AIE '89 Proceedings of the 2nd international conference on Industrial and engineering applications of artificial intelligence and expert systems - Volume 1
Pages 462-468
ACM
New York, NY
, USA
©1989
table of contents
ISBN:0-89791-320-5
doi>
10.1145/66617.66675
1989 Article
Bibliometrics
· Downloads (6 Weeks): 0
· Downloads (12 Months): 5
· Downloads (cumulative): 123
· Citation Count: 0
Tools and Resources
Buy this Article
TOC Service:
Email
RSS
Save to Binder
Export Formats:
BibTeX
EndNote
ACM Ref
Share:
|
Tags:
design
management
office automation
plan execution, formation, and generation
theory
Feedback
|
Switch to
single page view
(no tabs)
**Javascript is not enabled and is required for the "tabbed view" or switch to the
single page view
**
Powered by
The ACM Guide to Computing Literature
All Tags
Export Formats
Save to Binder