- 1 Scott, Thomas J., L.H. Tichenor, R.B.Bisland Jr., J.H. Cross, H, Team Dynamics in Sltt~ Programruing Projects, Proceedings 1993 ACM SigCSE Conference, Pheonix, Ar., March, 1994. Google Scholar
Digital Library
- 2 Advanced Logic Software, Anatool Users Mwtual, Beverley Hills, Ca 90212.Google Scholar
- 3 Crocker, H.D., G.R. Hall, and M.E. Wheeler, F.xcelerating b*ystents Analysis and Design, Boyd and Frazier, Boston, Ma., 1992.Google Scholar
- 4 Interactive Development Environments, Software Through l~tures User Manual, San Fran~~, Ca., June, 1991.Google Scholar
- 5 TechnoJocks Software, Inc. Turbo Techno.locks Toolkit Manual, Houston, Tx., 1993.Google Scholar
Index Terms
Handling interpersonal issues for student team projects
Recommendations
A possibilistic classification approach to handle continuous data
AICCSA '10: Proceedings of the ACS/IEEE International Conference on Computer Systems and Applications - AICCSA 2010Naive Possibilistic Network Classifiers (NPNC) have been recently used to accomplish the classification task in presence of uncertainty. Because they are mainly based on possibility theory, they run into problems when they are faced with imperfection ...
Process issues in course projects
ICSE '05: Proceedings of the 27th international conference on Software engineeringDefined software engineering process help teaching and guiding software engineering courses projects. However, using them raises several issues related to process and course features. Architecture issues relate to matching process and course lifecycle ...






Comments